---
title: "Fixed-Width Output Analysis for Markov Chain Monte Carlo (2006)"
description: "How fixed-width stopping rules make Markov chain simulation accountable through consistent error estimates, and what the experiments establish."
canonical: "https://research.elamur.ai/free/en/papers/jones-2006-fixed-width-output-analysis-markov/"
---
Elamur: [Mova](https://md.mova.elamur.ai/free/en/) · [Parse](https://mova.elamur.ai/free/en/parse/) · [Dictionary](https://md.dictionary.elamur.ai/free/en/) · [Translate](https://md.translate.elamur.ai/free/en/) · **Research** · [Gali](https://md.gali.elamur.ai/free/en/) · [MCP](https://mcp.elamur.ai/) · [Locations](https://md.locations.elamur.ai/free/en/) · [Weather](https://md.weather.elamur.ai/free/en/)

[Elamur Research](https://md.research.elamur.ai/free/en/) · [this page in HTML](https://research.elamur.ai/free/en/papers/jones-2006-fixed-width-output-analysis-markov/)

[home](https://md.research.elamur.ai/free/en/) / [papers](https://md.research.elamur.ai/free/en/papers/) / [2006](https://md.research.elamur.ai/free/en/papers/2006/) / Fixed-Width Output Analysis for Markov Chain Monte Carlo

# Fixed-Width Output Analysis for Markov Chain Monte Carlo

Paper · 2006 · Galin L. Jones, Murali Haran, Brian S. Caffo et al.

**Authors:** Galin L. Jones, Murali Haran, Brian S. Caffo and Ronald C. Neath · **Year:** 2006 · **Venue:** Journal of the American Statistical Association · **Licence:** [arXiv — non-exclusive license to distribute](http://arxiv.org/licenses/nonexclusive-distrib/1.0/)

[**301** citations OpenAlex, 2026-10-14](https://openalex.org/works?filter=cites:W1982508956) · Journal of the American Statistical Association · [licence](http://arxiv.org/licenses/nonexclusive-distrib/1.0/)

- [DOI 10.1198/016214506000000492](https://doi.org/10.1198/016214506000000492)
- [arXiv math/0601446](https://arxiv.org/abs/math/0601446)
- [OpenAlex](https://openalex.org/W1982508956)

## Deep dive: Fixed-Width Output Analysis for Markov Chain Monte Carlo

How fixed-width stopping rules make Markov chain simulation accountable through consistent error estimates, and what the experiments establish. · about 38 minutes to read

**In this deep dive**

1. [Summary](#dd-summary)
2. [Ideas worth borrowing](#dd-ideas-worth-borrowing)
3. [How Mova uses it](#dd-how-mova-uses-it)
4. [The problem and its context](#dd-the-problem-and-its-context)
5. [The method, step by step](#dd-the-method-step-by-step)
6. [Experiments and results](#dd-experiments-and-results)
7. [What the ablations show](#dd-what-the-ablations-show)
8. [Limitations](#dd-limitations)
9. [What came after](#dd-what-came-after)

### Summary

A simulation can keep producing observations long after its results look stable. The practical question is whether those observations have made the quantity being estimated accurate enough. This paper studies that question for Markov chain Monte Carlo, or MCMC, where successive observations depend on one another. Its proposed stopping criterion is direct: specify an acceptable uncertainty around an estimated expectation, calculate an interval that accounts for dependence, and continue sampling until that interval is sufficiently narrow. This turns simulation length into a consequence of the desired precision rather than a decision based on patience, visual stability, or an arbitrary iteration budget.

The difficult part is estimating uncertainty correctly. An ordinary sample variance describes variation among individual observations, but the uncertainty of an average also depends on how observations are correlated across time. The authors examine regenerative simulation, abbreviated RS, and batch means. RS identifies occasions when the chain restarts probabilistically, creating independent stretches of output. Batch means divides the output into adjacent blocks and uses variation among their averages. The paper distinguishes conventional batch means with a fixed batch count, called BM, from a version whose block lengths and block count both grow with the simulation, called consistent batch means, or CBM.

The main theoretical contribution is to establish sufficient conditions under which these uncertainty estimates converge almost surely to the appropriate limiting variance. This property, called strong consistency, matters because stopping depends on repeatedly inspecting an estimated interval. A central limit theorem alone does not establish that the variance estimate used in those inspections will behave properly. For RS, the authors connect geometric ergodicity and moment assumptions about the measured function to the required properties of regeneration tours. For CBM, they extend an earlier consistency argument to geometrically ergodic chains, using a strong approximation by Brownian motion and explicit restrictions on batch growth.

The empirical investigation compares the methods in a Pareto example, a hierarchical batting-average application, conditional testing with contingency tables, and a spatial disease application. BM uses 30 batches; the CBM alternatives use batch lengths based on powers of 1/3 and 1/2. The authors report that fixed-count BM produces uncertainty estimates that are too small and consequently stops too early. RS and CBM perform more similarly, although their coverage is imperfect and their relative performance depends on the application. The practical recommendation favors the square-root batch schedule as a general choice. These are asymptotic procedures supported by finite-run experiments, not exact guarantees that every reported interval at every tolerance achieves its nominal coverage.

### Ideas worth borrowing

Choose precision before computation. The stopping rule begins with an acceptable error scale for a particular expectation. That makes the computational objective interpretable: continue until the estimated uncertainty is small enough for the intended use. This idea transfers to other simulation-based calculations whenever a meaningful numerical tolerance can be specified. It also forces a useful distinction between producing many observations and obtaining a sufficiently accurate answer. A large output file is not itself evidence that an estimate meets its purpose.

Estimate uncertainty for the average. Dependence changes the variability of an average even when the marginal distribution of each observation remains the same. The paper therefore targets the variance appearing in the limiting distribution of the average, including contributions from covariance across time. The reusable lesson is to identify the uncertainty attached to the actual reported statistic. In any computation that reuses related observations, treating individual measurements as independent can make a stopping decision look more confident than the evidence warrants.

Let the uncertainty estimator improve with the run. Increasing the simulation length does not automatically improve every variance estimator. A fixed batch count leaves too little independent information about variability among batch averages. CBM addresses this by allowing both block length and block count to increase. The broader design principle is to examine whether auxiliary estimates become more informative as the main computation grows. An estimator that remains structurally constrained can become the weak point of an otherwise convergent procedure.

Recover independent units when possible. Regeneration makes dependent output manageable by grouping it into tours that are independent under the construction. Tour lengths vary, so the analysis records both the accumulated quantity and the duration of each tour. This is useful beyond the immediate variance calculation as a way of thinking about stochastic systems: meaningful independent units may be episodes rather than individual observations. The qualification is essential. Independence comes from a justified probabilistic construction, not from merely placing boundaries in a sequence.

Protect against persuasive early estimates. A narrow interval can reflect a poor early estimate of variability rather than genuine precision. The penalty term in the stopping rule delays termination while the variance estimator is immature. The paper does not establish an optimal penalty, but it makes the failure mode explicit. Similar safeguards are useful whenever an automated decision is driven by an uncertainty estimate that is itself learned from limited output. The safeguard should have a clear role and should become negligible under the theory supporting eventual termination.

Separate mathematical validity from practical calibration. Strong consistency and a functional central limit theorem justify the limiting behavior of the procedure. Repeated simulation then tests how well that justification carries over to finite runs. The authors use both because neither answers the other's question. This separation is worth preserving in [evaluation and benchmarks](https://md.research.elamur.ai/free/en/topics/evaluation-benchmarks/): a method can have an appropriate limiting argument and still need empirical checks for the particular tolerances, dependence patterns, and target quantities encountered in practice.

### How Mova uses it

For Mova, the small transparent language system written in Rust, the most defensible connection is a possible design for simulation-based evaluation. The paper does not establish an existing Mova implementation, and it does not study language processing. Its relevance would arise if Mova used dependent stochastic samples to estimate a clearly defined quantity. In that setting, the paper offers a way to explain why computation stopped and what uncertainty remains around the reported average.

The first requirement would be to identify the quantity being estimated. A stopping rule cannot be attached meaningfully to “the system” in general. It must refer to an observable function of a stochastic state and to an expectation under a specified target distribution. If Mova introduced such a calculation, the interface could expose the target quantity, the current estimate, the estimated Monte Carlo error, and the requested tolerance. These are possible uses of the paper's framework, rather than descriptions of features already built.

CBM would be the more accessible candidate when output comes from a chain whose relevant assumptions have been justified. Its basic bookkeeping involves consecutive blocks, averages within those blocks, and a variance estimate calculated from their differences. A transparent implementation could make those intermediate quantities inspectable. That would fit an engineering preference for calculations whose stopping decisions can be reconstructed from recorded output. However, implementing the arithmetic would be only part of the work: the paper's consistency result also requires suitable properties of the stochastic process and the measured function.

RS suggests a different route if a future stochastic component admits a useful regeneration construction. Mova could then record tour boundaries, tour lengths, and accumulated measurements. The attraction would be that the independent units used in the error calculation have an explicit probabilistic meaning. The obstacle is equally concrete: valid regeneration probabilities must be derived for the actual transition mechanism. A convenient point in a program's control flow is not automatically a regeneration event.

The paper also offers a useful reporting discipline even before any such algorithm is implemented. It separates the variability of sampled states from uncertainty in their average, and it separates apparent stabilization from demonstrated estimation precision. If Mova reports results from repeated stochastic computation, those distinctions could prevent a visually steady sequence from being presented as an adequately measured quantity. The relevant contribution would be better accounting for computational uncertainty, not a general claim about linguistic correctness.

Any adoption would need to preserve the scope of the guarantee. A narrow Monte Carlo interval concerns the accuracy of an estimated expectation under the chosen distribution. It does not establish that the distribution represents language appropriately, that a linguistic decision is correct, or that all sources of uncertainty have been measured. The paper gives Mova a possible stopping and reporting framework for a specific kind of computation. It supplies no evidence that Mova currently uses it, and no direct evaluation of its value for language tasks.

### The problem and its context

#### An average can converge without telling us when to stop

The starting point is an expectation under a probability distribution. The distribution may be too complicated for direct integration or straightforward independent sampling, while an MCMC algorithm can generate a dependent sequence whose long-run behavior follows that distribution. Applying a function to each state and averaging the resulting values produces an estimate of the desired expectation.

An ergodic theorem supplies a fundamental reassurance: under the chain assumptions used in the paper, that average approaches the target with probability one as the run grows indefinitely. Yet a statement about an unlimited sequence does not say how much simulation is enough for a particular calculation. A practitioner still needs to decide whether the current numerical result is accurate enough to report.

The authors describe several familiar ways of making that decision. One is simply to stop when available time or patience has been exhausted. Another is to conduct preliminary runs, judge their variability, and choose a final run length in advance. A third is to watch the running estimate until it looks stable. These approaches can guide computation, but they do not directly produce a quantified statement about the remaining Monte Carlo error.

This distinction is especially important for a slowly changing average. Stability is an observation about how much the estimate has moved recently. Precision concerns its uncertainty relative to the expectation being sought. A sequence can appear stable over a limited period without supplying the information needed for a narrow confidence interval. Conversely, an estimate may continue to fluctuate while already being precise enough for its intended use.

The paper's response is to make the stopping criterion match the inferential question. Rather than deciding whether the output looks settled, estimate the uncertainty of the average and compare it with a tolerance chosen by the user. Simulation then becomes a sequential statistical procedure: new output is added, uncertainty is reassessed, and termination occurs when the criterion is met.

#### Dependence is the central statistical complication

Classical sequential confidence procedures provide part of the background. The paper discusses work by Chow and Robbins, Nadas, and Liu on intervals with a prescribed width. Those procedures address independent sampling. The difficulty here is that MCMC observations are correlated, so their results cannot simply be transferred by inserting the chain's raw output into an independent-sample formula.

For dependent observations, the limiting variance contains a marginal variance and a sequence of covariance terms. The covariance terms describe how the measured quantity at one time relates to its values later in the chain. Ignoring them can make the uncertainty of an average look much smaller than it is.

The authors therefore treat a Monte Carlo standard error as an essential part of output analysis. It describes the numerical uncertainty produced by the simulation procedure. This is distinct from the variability within the target distribution, even though that variability contributes to the calculation. An application can have a broad target distribution while its expectation is estimated precisely, or a modest marginal spread while dependence makes its estimated expectation expensive to determine accurately.

The paper concentrates on RS and non-overlapping batch means because it identifies them as common approaches to estimating this limiting variance in MCMC. Their appeal differs. Batch means can be applied by partitioning output after it has been generated. RS needs more knowledge of the chain, but it creates independent tour-level observations that support a direct analysis.

#### What earlier theory already established

Glynn and Whitt had established an asymptotic framework for simulation stopping rules based on estimated interval width. In that framework, making the requested tolerance increasingly strict leads the coverage probability toward the intended confidence level, provided the required conditions hold.

The conditions go beyond an ordinary central limit theorem. The framework requires a functional central limit theorem, which concerns the behavior of a cumulative process rather than only its value at a single large sample size. It also requires almost-sure convergence of the variance estimator and a penalty that becomes negligible at an appropriate rate.

The authors identify strong consistency of the variance estimator as an important unresolved practical link for MCMC. Many chains admit central limit theorems under conditions already studied in the field. But an interval calculated with an unreliable variance estimate does not become justified merely because the average itself has an asymptotic normal distribution.

Earlier work had also exposed a weakness in conventional batch means. Glynn and Iglehart, and Glynn and Whitt, showed that keeping the batch count fixed does not yield a consistent estimate of the limiting variance. Damerdji developed a route to strong consistency when the batching arrangement grows appropriately, using a strong invariance principle. The present paper builds on that route while seeking assumptions that can be related more directly to established Markov chain properties.

For regeneration, the paper draws on earlier methods for splitting a chain and identifying restart events. Mykland, Tierney, and Yu supplied practical constructions that avoid direct sampling from a troublesome residual transition distribution. Earlier work by Hobert and collaborators provided tour-based theory that the authors extend through additional moment results.

#### Why geometric ergodicity matters here

The paper organizes its conditions around rates at which a chain approaches its invariant distribution. Geometric ergodicity supplies an exponentially decreasing bound, with a multiplicative factor that may depend on the starting state. Uniform ergodicity imposes a bound that is controlled uniformly over starting states.

These are sufficient conditions, not descriptions of every chain that could support a central limit theorem. The authors acknowledge that weaker alternatives exist. Their reason for emphasizing geometric and uniform ergodicity is practical: the MCMC literature they discuss contains constructive methods for proving such properties for particular samplers.

One such method uses a drift inequality. Informally, it identifies a function that becomes smaller on average outside a suitable region of the state space. Combined with additional structure, this provides control over the chain's return behavior and convergence rate. The paper does not suggest that checking these conditions is automatic. It argues that existing convergence analyses make them usable assumptions for a substantial range of applications.

The intended contribution is therefore a bridge. On one side are established properties of a sampler and moment assumptions about the quantity being averaged. On the other side is a stopping procedure with a meaningful asymptotic coverage statement. The variance consistency results connect those sides.

### The method, step by step

The method begins by fixing the expectation to be estimated and a desired interval half-width. It then runs the chain while calculating an uncertainty estimate that accounts for dependence. RS and CBM provide different ways to obtain that estimate. The final stopping decision combines the estimated interval radius with a safeguard against premature termination.

From dependent samples to a precision-based stopping decision The steps in order.

#### Define the target and its running estimate

The quantity of interest is an expectation of a function under the target distribution:

```
Eπg := ∫𝒳 g(x) π(dx)
```

Here, 𝒳 is the state space, x is a possible state, π is the target probability distribution, and g is the real-valued function being measured. Eπg denotes its expectation. The integral covers the possible states and weights each function value according to π.

The function g determines what the simulation is trying to learn. It may select a parameter from a posterior draw, return a value whose mean is of interest, or indicate whether a sampled contingency table satisfies a testing condition. The stopping calculation concerns that function, so changing g can change both the required moment assumptions and the simulation effort.

The chain produces states X₀, X₁, and subsequent states. The corresponding estimator is:

```
ḡₙ := (1/n) ∑ᵢ₌₀ⁿ⁻¹ g(Xᵢ) → Eπg
```

The symbol n is the count of included observations, Xᵢ is the state at index i, and ḡₙ is the average of the measured values. The arrow expresses the almost-sure convergence supplied by the ergodic theorem under the paper's Harris ergodicity assumptions.

Those assumptions include time-homogeneous transitions, aperiodicity, irreducibility relative to π, and positive Harris recurrence. A newcomer need not treat these as interchangeable labels. Together, they provide the setting in which the chain has the required long-run averaging behavior. They do not, on their own, finish the uncertainty analysis.

#### Establish the scale of Monte Carlo error

A central limit theorem describes the large-run fluctuations of the average:

```
√n (ḡₙ − Eπg) →ᵈ N(0, σ²g)
```

The notation →ᵈ means convergence in distribution. N denotes a normal distribution, its center is 0, and σ²g is the limiting variance associated with the function g. The factor √n puts the shrinking estimation error on a scale with a nondegenerate limiting distribution.

The dependence-adjusted variance has the following form:

```
σ²g := varπ{g(X₀)} + 2 ∑ᵢ₌₁∞ covπ{g(X₀), g(Xᵢ)}
```

The operation varπ gives variance under the invariant distribution, while covπ gives covariance under that distribution. The index i measures separation along the chain. The covariance sum incorporates serial dependence; it is why the variability of individual g values is insufficient for estimating the uncertainty of their average.

The paper lists several sets of conditions that establish this central limit theorem. Some involve polynomial convergence rates combined with boundedness or sufficiently high moments of g. Others use geometric ergodicity with a logarithmic moment condition, or geometric ergodicity plus detailed balance and a finite second moment. Uniform ergodicity together with a finite second moment supplies another route.

Detailed balance is a symmetry condition on transitions:

```
π(dx) P(x,dy) = π(dy) P(y,dx)
```

P is the transition kernel, so P(x,dy) describes the probability of moving from x into an infinitesimal region around y. The notation π(dx) weights the initial state under the invariant distribution. The equality says that the stationary probability flow between the states is symmetric.

The authors explain that Metropolis–Hastings constructions satisfy this condition, whereas Gibbs samplers need not. Its relevance is specific: it can support a central limit theorem under a weaker moment requirement than a general geometrically ergodic chain would need in the stated result. It does not eliminate the separate need to justify the variance estimator.

#### Turn an interval radius into a stopping criterion

Once a suitable estimate of σ²g is available, the general stopping rule is:

```
t* σ̂ₙ/√n + p(n) ≤ ε
```

Here, σ̂ₙ is the estimated limiting standard deviation, t* is an appropriate quantile for constructing the interval, and ε is the chosen half-width tolerance. The function p(n) is non-negative and discourages stopping while the variance estimate is still unreliable.

The first term is the estimated interval radius. The penalty makes the stopping decision more demanding than that radius alone. Once the penalty has become negligible or disappeared, the decision is governed chiefly by the estimated Monte Carlo standard error.

A simple safeguard used by the authors is:

```
p(n) = ε I(n ≤ n*)
```

The function I is an indicator: it takes the value 1 when the condition inside it holds and 0 otherwise. The symbol n* denotes a preliminary run-length threshold. With this construction, the tolerance itself is added to the interval radius before the threshold has been passed.

The theoretical requirement on a general penalty is:

```
p(n) = o(n⁻¹ᐟ²)
```

The notation o means that p(n) becomes negligible relative to n⁻¹ᐟ² as n increases. A penalty confined to an initial portion of the run satisfies this eventual requirement. The authors also discuss a decaying addition that could continue beyond the preliminary threshold, but they do not derive an optimal choice.

Because the interval is repeatedly checked, the eventual sample size is random. The relevant limiting guarantee is expressed at that random stopping time:

```
Pr(Eπg ∈ Int[T(ε)]) → 1 − δ  as  ε → 0
```

Pr denotes probability, T(ε) is the earliest time satisfying the stopping criterion, and Int[T(ε)] is the interval reported at that time. The symbol δ controls the intended noncoverage probability. The statement concerns increasingly demanding tolerances; it is not an exact finite-run coverage identity.

#### Construct regeneration opportunities

RS begins with a lower bound on the transition kernel:

```
P(x,A) ≥ s(x) Q(A)
```

The set A is a measurable region of the state space. The function s(x) lies between 0 and 1, and Q is a probability distribution that does not depend on the current state x. This inequality is called a minorization condition. The paper also requires the stationary expectation of s to be positive.

The lower bound says that part of every applicable transition can be represented by a common distribution Q. The remaining part may still depend on the current state. This gives a mixture representation:

```
P(x,dy) = s(x) Q(dy) + [1 − s(x)] R(x,dy)
```

R is the residual transition distribution. At state x, the mixture uses Q with probability s(x) and otherwise uses R. When the Q component is selected, the next state is drawn without dependence on the current state through that component. This event creates the probabilistic restart needed for regeneration.

The split-chain construction records the original state together with an auxiliary indicator δᵢ. An indicator value of 1 marks selection of the common component. The original states still follow the intended transition mechanism; the extra variable exposes structure that was hidden in the unsplit chain.

Directly drawing from R can be difficult. The implementation method discussed in the paper avoids that requirement by first drawing an ordinary transition and then deciding retrospectively whether it belongs to the regeneration component.

When transition and restart distributions have densities, the regeneration probability is:

```
Pr(δᵢ = 1 | Xᵢ, Xᵢ₊₁) = s(Xᵢ) q(Xᵢ₊₁) / k(Xᵢ₊₁ | Xᵢ)
```

The density k is the original transition density, q is the density of Q, and δᵢ is the auxiliary indicator. The conditioning uses the observed transition from Xᵢ to Xᵢ₊₁. This calculation permits the existing sampler to generate states while an additional random decision identifies regeneration events.

The paper also discusses an independence Metropolis–Hastings implementation. Its regeneration formula depends on ratios between the target density and proposal density and on a chosen constant c. The important practical feature is that the relevant normalizing constants need not be known. In a manageable discrete space, returns to a selected state offer another route to regeneration.

#### Convert tours into independent observations

Let τᵣ mark regeneration boundaries, with the initial boundary denoted τ₀. A tour is the sequence of states between consecutive boundaries. Its duration is:

```
Nᵣ = τᵣ − τᵣ₋₁
```

The symbol Nᵣ denotes the length of tour r. The quantities τᵣ and τᵣ₋₁ are its ending and starting boundaries. Different tours can have different durations.

The accumulated measurement over that tour is:

```
Sᵣ = ∑ᵢ₌τᵣ₋₁ᵗᵃᵘᵣ⁻¹ g(Xᵢ)
```

Here, Sᵣ is the sum of g values from the tour's initial state through the state immediately preceding its ending boundary. The upper limit denotes τᵣ − 1. Starting the split chain from Q makes the pairs consisting of Nᵣ and Sᵣ independent and identically distributed across tours.

This independence is the central advantage of RS. Individual states inside a tour remain dependent. The method does not pretend otherwise; it shifts the analysis to complete tours.

After R completed tours, the chain has supplied τᴿ observations, with τᴿ denoting the boundary after tour R. The average can be viewed as accumulated tour sums divided by accumulated tour lengths. Long tours therefore contribute according to their duration, instead of receiving the same weight as short tours.

The limiting result is written on a tour-count scale:

```
√R (ḡτᴿ − Eπg) →ᵈ N(0, ξ²g)
```

R is the completed-tour count, ḡτᴿ is the average at the corresponding boundary, and ξ²g is the limiting variance when the error is scaled by √R. This variance differs in scale from σ²g, which belongs to the iteration-count formulation.

The RS variance estimator is:

```
ξ̂²RS := [1/N̄²] [1/R] ∑ᵣ₌₁ᴿ (Sᵣ − ḡτᴿ Nᵣ)²
```

N̄ is the average tour duration. The expression inside the square compares the accumulated measurement in a tour with the amount expected from that tour's duration at the current estimated mean. Dividing by N̄² converts the tour-level fluctuations to the scale used in the regenerative central limit theorem.

The theoretical challenge is to establish that tour lengths and tour sums have the moments needed for these calculations. The paper's regenerative moment lemma links such conditions to geometric ergodicity and moments of g under π. Its resulting proposition states that a moment of order 2 + δ, for some positive δ, together with geometric ergodicity and a minorization condition, is sufficient for the regenerative central limit theorem and strong consistency of the estimator.

The corresponding stopping rule is:

```
z ξ̂RS/√R + p(R) ≤ ε
```

The symbol z is the chosen standard-normal quantile, ξ̂RS is the square root of the regenerative variance estimate, and p(R) is now a safeguard indexed by tour count. The tolerance ε retains its interpretation as the desired interval half-width.

#### Build a variance estimate from batches

Batch means takes a different approach. It divides a run into a batches, each containing b observations, so that the analyzed length satisfies:

```
n = ab
```

The symbols a and b denote batch count and batch length. The symbol n is the total included output. In the consistency analysis, both batching quantities depend on n.

The mean within batch j is:

```
Ȳⱼ := (1/b) ∑ᵢ₌₍ⱼ₋₁₎ᵦʲᵇ⁻¹ g(Xᵢ)
```

Ȳⱼ is the average in batch j, and j ranges over the batches. The summation covers the consecutive observations belonging to that batch. Larger blocks can absorb more of the dependence within each average, although block averages are only approximately independent in the practical motivation.

The variance estimator is:

```
σ̂²BM = [b/(a − 1)] ∑ⱼ₌₁ᵃ (Ȳⱼ − ḡₙ)²
```

The factor b rescales variation among batch averages to estimate the limiting variance of the original chain average. The denominator a − 1 is the sample-variance adjustment across the a batch averages. The overall center is ḡₙ.

The arithmetic is simple, but the growth schedule is decisive. If a remains fixed, the estimator does not become consistent. To obtain CBM, the authors require increasingly long batches and an increasing supply of batch averages, together with additional rate restrictions.

This creates a balancing problem. Blocks must be long enough for the approximation to suppress problematic dependence, while enough blocks must remain to estimate their variability. Increasing one component while neglecting the other does not provide the desired guarantee.

#### Understand the strong approximation behind CBM

The proof uses a strong invariance principle:

```
|∑ᵢ₌₁ⁿ g(Xᵢ) − nEπg − σg B(n)| = O(γ(n))
```

B is a standard Brownian motion, σg is the positive square root of the limiting variance, and γ(n) controls the approximation error. The notation O means that the error is eventually bounded by a constant multiple of γ(n), almost surely.

This is stronger than saying that a normalized average has an approximately normal distribution. It compares the accumulated centered output with an entire Brownian trajectory on a common probability space. The authors then transfer properties of Brownian batch averages to the chain's batch averages while controlling the approximation error.

For geometrically ergodic chains under the stated moment assumptions, their approximation has:

```
γ(n) = nᵅ log n
```

The symbol α is an exponent determined by the available moment condition, and log denotes the logarithm. The expression describes the size of the pathwise approximation error used in the proof.

The exponent is:

```
α = 1/(2 + δ)
```

The symbol δ is positive and appears in the assumption that the stationary moment of order 4 + δ for g is finite. It is a moment parameter here, rather than the confidence-level parameter used earlier.

The geometrically ergodic CBM proposition requires the batch count to diverge, batch length to diverge, and batch length to become negligible relative to n. A further approximation requirement is:

```
bₙ⁻¹ n²ᵅ [log n]³ → 0
```

The symbol bₙ is the batch length at run size n. This condition ensures that batches grow quickly enough to make the strong-approximation errors harmless in the variance calculation. The exponent α has the definition just given.

A summability condition is also imposed:

```
∑ₙ (bₙ/n)ᶜ < ∞
```

The constant c is at least 1. This requirement controls the batching sequence across sample sizes, supporting the almost-sure convergence argument. It is part of the sufficient conditions, rather than a tuning objective estimated from the output.

A convenient schedule is:

```
bₙ = ⌊nᶿ⌋
```

The floor brackets select an integer batch length, and θ is a growth exponent. The batch count is chosen from the run length and this block length. The paper examines θ values of 1/3 and 1/2 in its experiments.

Under the geometric-ergodicity proposition, the power schedule must satisfy:

```
1 > θ > (1 + δ/2)⁻¹ > 0
```

The symbols θ and δ retain their batching and moment meanings. This inequality shows why the growth schedule and available moments cannot be chosen independently. The authors note that the 1/3 schedule calls for a stronger moment assumption than the 1/2 schedule in this analysis.

The batch-means stopping rule uses a Student quantile:

```
tₐₙ₋₁ σ̂BM/√n + p(n) ≤ ε
```

The quantity tₐₙ₋₁ is the selected Student t quantile with aₙ − 1 degrees of freedom. The symbol aₙ is the current batch count, σ̂BM is the square root of the batch variance estimate, and p(n) supplies the early-run safeguard.

#### What the proofs add to the algorithm

For RS, the proof route uses the tails of regeneration times and inequalities that separate tour duration from large values of g. Geometric ergodicity supplies strong control over regeneration times. Moment assumptions on g then make the needed tour-level quantities finite. Once those ingredients are available, laws of large numbers for independent tours support consistency of the regenerative variance estimator.

For CBM, the proof separates a Brownian reference estimator from the discrepancy between that reference and the actual chain estimator. Earlier Brownian results establish convergence of the reference. The authors bound the discrepancy using the strong approximation and the batch-growth conditions.

This matters because the variance estimator is not assumed correct merely because it is familiar. Its error is analyzed explicitly. The resulting conditions show how properties of the chain, tail behavior of the measured function, and choices made by the implementation jointly support the stopping procedure.

Neither CBM consistency proposition assumes stationary initialization. The authors therefore do not require a burn-in segment for this asymptotic procedure. RS uses its specified restart initialization. These are particular mathematical statements about the methods' limiting behavior, not a claim that starting values can never influence a finite simulation.

### Experiments and results

#### The comparison and its metrics

The experimental study examines BM with 30 batches, RS, and CBM under the 1/3 and 1/2 batch-growth schedules. Depending on the difficulty of the application, the replication count ranges from 2000 to 9000. Each replication generates chain output shared by the competing procedures, allowing their stopping behavior to be compared on the same underlying simulation.

A method stops when its interval satisfies the selected precision criterion, while the remaining methods continue until they also finish. The recorded outcomes include coverage probability, interval half-width, and chain length. Coverage measures how often the reported interval includes the target value across replications. Half-width measures the uncertainty reported at stopping. Chain length measures the simulation effort required to reach that decision.

The intervals have a nominal confidence level of 95%. Minimum-run choices differ across applications and reflect the authors' experience with the corresponding chains. The study therefore evaluates practical implementations of the stopping procedures, including their safeguards, instead of an abstract interval formula in isolation.

The numerical entries of the experimental summary tables are not available in the paper's readable table content. Consequently, exact coverage estimates, average chain lengths, and their reported standard errors cannot be reproduced. The prose nonetheless states the direction of the main comparisons and supplies several important numerical settings and reference values. Those support a substantive account of the findings without inventing the missing measurements.

#### A rapidly mixing Pareto example

The benchmark estimates a Pareto expectation using an independence Metropolis–Hastings sampler with another Pareto distribution as its proposal. The setup permits an explicit bound on convergence and makes the target's moments straightforward to examine.

For the main construction, the target shape parameter is β = 10 and the proposal shape parameter is λ = 9. Under the stated parameter relationship, the target-to-proposal density ratio is bounded. The resulting chain is uniformly ergodic, and the displayed convergence bound specializes to 10⁻ⁿ. The authors use this example as a case where convergence is extremely fast, rather than as a difficult mixing problem.

RS uses the independence-sampler regeneration calculation with c = 1.5. The target shape is chosen so that the moment requirements for the batch-means consistency argument are satisfied. This makes the example useful for separating shortcomings in output analysis from difficulties caused by a poorly behaving sampler.

A further comparison examines Geweke's diagnostic, called GD, against CBM. For that experiment, α = 1, β = 10, and λ = 9, and the authors conduct 9000 independent replications. The preliminary threshold is n* = 45, while the boa software requires at least 120 iterations before GD can be calculated.

CBM uses ε = .005 as its desired interval half-width. The diagnostic alternative is evaluated with p-value thresholds of .05, .10, .2, and .4. The outcomes are mean-squared error of the final point estimate and the length of the chain when each procedure stops.

The authors report that CBM gives substantially better estimation accuracy than GD, in spite of the favorable mixing of this example. GD stops too early for the estimation objective, and adjusting its threshold does not bring a substantial improvement. Without the table entries, the size of the MSE difference cannot be stated. The supported conclusion is that detecting stability through this diagnostic does not control estimation precision in the way the fixed-width criterion attempts to do.

#### A hierarchical batting-average application

The batting data concern 18 players from the 1970 Major League Baseball season, with raw averages based on 45 official at-bats. The analysis uses the transformed observations discussed in the paper and a hierarchical normal specification with an inverse-gamma variance component and a flat prior for the common location.

The sampling method is a block Gibbs sampler. Its transition updates the variance component, then the common location, and then the player-specific quantities. The paper relies on an earlier geometric-ergodicity result and states that the necessary moment conditions for RS and CBM can be checked.

The target quantity is the posterior mean of θ₉, corresponding to Ron Santo's transformed long-run batting average. This choice turns a larger posterior calculation into a concrete scalar precision problem. The stopping methods are judged on their ability to estimate that expectation and construct an interval around it.

A useful feature of this application is an independent reference calculation. The appendix develops an accept–reject procedure that can produce independent posterior draws. The authors generate 9 × 10⁷ such draws for the relevant marginal quantity and treat the resulting mean estimate as the truth when evaluating coverage.

This reference is highly precise by the study's design, but it remains an estimate rather than an analytic posterior mean. The application also demonstrates how the paper uses an MCMC procedure as an experimental test case even when a separate sampling construction can support validation.

In the reported comparison of batch schedules, the 1/3 choice provides better coverage than the 1/2 choice for this application. The authors group it with the Pareto case as a rapidly mixing chain where relatively short batches can be tolerated.

#### Exact conditional testing with contingency tables

The conditional-testing application uses paired tumor ratings assigned by pathologists. The testing setup fixes the table margins and an additional sufficient statistic associated with a linear-by-linear association. Permissible tables must satisfy all these constraints.

The candidate space is large if only the margins are considered: the paper describes over twelve billion possibilities. Enforcing the additional constraint reduces the relevant reference set to approximately 34,000 tables. For this particular case, the authors enumerate the constrained set and obtain an exact conditional p-value.

The observed reference p-value is .044. A chi-squared approximation gives .368. The chart compares these reported p-values; its direction records their numerical ordering, instead of suggesting that smaller p-values are inherently better statistical results.

Tumor-rating goodness-of-fit test, reported p-values Conditional enumeration and the chi-squared approximation give sharply different test results.

**The numbers**

| System or setting | p-value |
| --- | --- |
| Chi-squared approximation | .368 |
| Exact conditional reference (this paper) | .044 |

The simulation task is to estimate the exact conditional probability by averaging an indicator over sampled tables. The Metropolis–Hastings algorithm comes from Caffo and Booth, and the paper notes its use in the R package exactLoglinTest. For this application, the chain is uniformly ergodic and the measured function is bounded, so the regularity conditions are readily satisfied.

RS uses returns to a fixed table. To select that table, the authors run a preliminary chain for 1000 iterations and choose the visited state having the largest stationary probability. That selected state remains fixed across the subsequent replications.

Coverage is less satisfactory here than in the other examples. The authors explain that estimating a small probability with a Wald interval can give poor coverage even under independent sampling. This matters for interpretation: a valid dependence adjustment does not by itself repair every weakness of the interval's form.

The 1/2 batch schedule performs better than the 1/3 schedule in this application. The authors attribute the need for larger batches to less favorable mixing than in the rapidly converging examples.

#### Spatial disease risk

The spatial application uses Scottish lip cancer counts from 56 counties, together with expected counts based on the age-sex composition of their populations. The likelihood is Poisson, with regional log-relative risk decomposed into an unstructured component and a spatially structured component.

The structured component uses a conditional autoregressive prior linked to county adjacency. Precision parameters have gamma priors. The authors emphasize that the likelihood does not identify the separate random-effect components and that the spatial prior is improper. These features make the application more demanding than the Pareto benchmark.

The posterior dimension is 114. The sampler is an independence Metropolis–Hastings construction with a heavy-tailed proposal, for which earlier work establishes uniform ergodicity. The RS implementation uses log c = −342.72, with the choice guided by an empirical supremum of the target-to-proposal density ratio.

The monitored quantity is the posterior expectation of φ₇, the spatial-clustering contribution to log-relative risk for County 7. An independent simulation of length 10⁷ supplies an estimated reference value that is treated as truth for the experiment.

As in the conditional-testing application, the square-root batch schedule gives better coverage than the 1/3 schedule. The result supports the authors' practical preference for larger batches when dependence remains important over longer stretches of output.

#### What the overall comparison establishes

Every estimated coverage probability in the study falls below .95. The authors' assessment using the reported standard errors is more differentiated than that observation alone. Fixed-count BM falls significantly short in every example. RS does not differ significantly from .95 in 3 out of 4 examples.

CBM's performance depends on batch growth. The 1/3 schedule is favored in the Pareto and batting-average applications; the 1/2 schedule is favored in conditional testing and spatial disease risk. The authors connect this pattern to mixing and recommend the square-root schedule for general use.

RS tends to require somewhat longer chains than CBM, while CBM generally runs longer than BM. That ordering should be read alongside coverage. Shorter computation is not an advantage if it results from underestimating uncertainty and stopping before the intended precision has been reached.

The authors also report that RS and CBM end with interval half-widths closer to the requested target than BM does. RS intervals appear more stable across replications. Taken together, the findings support RS and CBM as more dependable choices than the fixed-count alternative, while leaving meaningful finite-run imperfections visible.

### What the ablations show

The paper offers controlled comparisons of output-analysis methods and tuning choices instead of a component-removal ablation study.

#### Fixed batching versus a growing batching scheme

The most important comparison keeps the sampled quantity and underlying chain output common while changing how uncertainty is estimated. BM uses 30 batches, whereas CBM allows its partition to grow with the run.

This comparison asks whether conventional batching is adequate merely because the chain has produced a long sequence. The reported answer is unfavorable to the fixed-count procedure. Its error estimates are too small, its stopping times are too early, and its interval coverage is significantly below the nominal level throughout the examples.

The theoretical analysis explains why this is more than an unfortunate choice in a single experiment. Holding the batch count fixed prevents consistency of the limiting-variance estimator. The experiments show a practical consequence that matters directly for stopping: underestimated uncertainty can make a procedure appear efficient by causing premature termination.

This does not establish that every conceivable fixed-count batching implementation will fail identically in every application. It establishes both a structural consistency limitation and poor performance for the specific fixed-count baseline investigated.

#### Shorter and longer growth schedules

The comparison between the 1/3 and 1/2 schedules isolates a consequential choice within CBM. Both schedules increase batch length and batch count, but they distribute the available output differently.

The paper's practical explanation concerns residual dependence. When the chain mixes very quickly, shorter batches can be acceptable, leaving more batch averages from which to estimate variability. When dependence persists, longer batches provide a better basis for treating their averages as approximately independent.

The experiments follow that pattern. The smaller exponent is favored in the Pareto and batting applications, and the larger exponent in the conditional and spatial applications. This is evidence that a batching rule should be assessed against the chain's behavior, rather than selected solely because it has an attractive asymptotic property under some criterion.

The paper discusses earlier theoretical recommendations that also differ. Chien's analysis favors the 1/2 exponent for the rate at which batch averages approach normality, while Song and Schmeiser favor 1/3 for asymptotic mean-squared error of the variance estimator under different conditions.

These criteria do not ask exactly the same question. A choice that improves an asymptotic variance-estimation objective need not give the best interval coverage at the stopping tolerance used in a particular application. The experiments make that distinction concrete without producing a universal optimal schedule.

#### Regeneration versus batching

RS and CBM use different statistical units. Regeneration obtains independent tour-level pairs through the split-chain construction. Batching obtains consecutive blocks whose means are motivated as approximately independent and whose consistency is supported by growth conditions and strong approximation.

The empirical comparison asks whether RS's stronger structural basis translates into a decisive finite-run advantage. The authors find broadly comparable coverage, with RS tending towards longer runs and more stable interval widths.

That result supports a practical tradeoff. RS can be attractive when regeneration is available and useful tours occur frequently enough. CBM avoids deriving regeneration probabilities and is somewhat easier to implement. The paper's conclusion gives CBM a practical role without claiming that it matches RS in every theoretical respect.

The comparison also illustrates why implementation cost should be considered alongside simulation length. A method may require less specialized probabilistic work even if its finite-run behavior is similar. The paper does not quantify that development effort, but it identifies the difference clearly.

#### A convergence diagnostic versus estimation accuracy

The Pareto comparison with GD tests a different kind of stopping logic. GD asks whether portions of the chain provide evidence of instability in the estimated mean. CBM asks whether the estimated uncertainty has become small enough for a specified tolerance.

The experiment is deliberately favorable to the sampler: its mixing is extremely fast. Even there, the diagnostic's stopping decisions do not produce the same estimation accuracy as CBM. Changing diagnostic thresholds does not substantially solve the problem reported by the authors.

The lesson is about the target of the procedure. Evidence that a diagnostic no longer detects a discrepancy does not automatically quantify how closely the current average estimates its expectation. This distinction remains relevant even when both methods use central-limit reasoning.

The comparison covers the particular diagnostic and thresholds studied. It does not establish a blanket result about every possible diagnostic. The broader claim supported by the setup is that a stopping method should explicitly address the estimation precision the user needs.

#### A small probability exposes another source of failure

The conditional-testing example analyzes a weakness that is separate from serial dependence. Its target probability is small, and the interval construction is a Wald interval. The authors identify this combination as a known source of poor coverage even with independent observations.

This analysis helps prevent a mistaken diagnosis of the results. Low coverage in this application cannot automatically be attributed entirely to an inadequate batch schedule or an ineffective regeneration mechanism. The approximation used to construct the interval also matters.

The paper does not replace the Wald interval or conduct a controlled comparison of alternative interval families. What it does offer is a careful qualification: improving the estimate of Monte Carlo variability is necessary for the stopping framework, but it does not guarantee that the final interval is well calibrated in every finite-sample setting.

### Limitations

#### The authors' asymptotic qualification

The authors explicitly ground the stopping procedure in asymptotic theory. Coverage approaches the intended level as the tolerance becomes increasingly strict under the stated assumptions. A user choosing a particular tolerance is still operating at a finite stopping time, where the approximation can be imperfect.

The experiments demonstrate that imperfection instead of concealing it. All reported coverage estimates are below the nominal level. RS and CBM compare favorably with fixed-count BM, but favorable comparison is not equivalent to exact calibration.

This qualification affects the meaning of a successful stopping decision. Satisfying the width inequality means that the implemented uncertainty calculation is small enough according to the chosen rule. The reliability of the associated confidence statement still depends on how accurately the large-run theory describes the current run.

#### The authors' assumptions on the chain and measured function

The paper's consistency propositions require more than a chain that can be simulated and appears to move around. Geometric or uniform ergodicity and suitable moments of g are central parts of the argument.

The authors acknowledge that some weaker conditions can support a central limit theorem. They emphasize their chosen conditions because weaker alternatives can be difficult to verify in applications. As a consequence, the results provide useful sufficient conditions rather than a characterization of all valid MCMC stopping procedures.

The moment requirements also differ across methods. The stated regenerative consistency result uses a moment of order 2 + δ. The geometric-ergodicity CBM result uses order 4 + δ. This makes RS's theoretical advantage concrete: its stated route to consistency needs less from the tails of the measured quantity.

These distinctions can matter even when the same chain is used for several expectations. A bounded indicator and an unbounded parameter function need not satisfy identical moment conditions. Validity is attached to the chain-function combination, not only to the sampler's name.

#### The authors' unresolved choices

The authors state that they do not know an optimal penalty function. Their examples use preliminary thresholds selected through experience with the chains. They also suggest a penalty that could decay after the preliminary threshold, but they do not establish that it is best.

Batch growth is another tuning choice with competing considerations. The theoretical restrictions identify admissible schedules under stated assumptions, while the experiments show that finite-run coverage can favor different choices in different applications. The recommendation for square-root batches is practical guidance, not a universal optimum.

Regeneration also has implementation costs. A valid minorization or regeneration-probability formula must be obtained, and a mathematically correct construction may be unhelpful if restart events are too rare. The authors specifically caution that returns to a fixed state become impractical in extremely large discrete spaces.

These are limitations the paper recognizes directly. Its argument is that RS can be practical in important cases and that CBM offers a more accessible alternative, not that either method eliminates all design decisions.

#### The authors' warning about interval form

The conditional-testing example shows that a sound variance-estimation framework can coexist with poor interval coverage. The authors attribute part of that difficulty to using a Wald interval for a relatively small probability.

A variance estimator addresses the scale of Monte Carlo fluctuations. It does not on its own establish that a symmetric normal-style interval captures the distribution of those fluctuations accurately at the available run length.

The paper does not investigate a replacement interval for that case. Hence, its results cannot support a claim that fixed-width stopping automatically solves small-probability interval estimation. The stopping framework and the interval construction must both be assessed.

#### A careful reading of the experimental reference values

The target expectation is not analytically available in several applications. The study therefore uses precise external calculations as reference values. For the batting application, those calculations come from independent posterior draws; for the spatial application, they come from a separate long chain.

A careful reader should distinguish such reference estimates from exact mathematical values. The study treats them as truth for assessing coverage, but their own numerical error is not absent simply because they were calculated separately.

The conditional-testing case provides a stronger reference because the constrained table space is enumerated. The Pareto setting also supplies an analytically specified expectation. The study thus combines different kinds of validation rather than relying on one common gold-standard construction.

This does not invalidate the comparisons. It limits how literally one should interpret coverage measurements against estimated reference values, especially when exact numerical discrepancies and their uncertainty cannot be inspected from the missing table entries.

#### A careful reading of scope

The experiments cover a useful range of cases, from very fast mixing to a high-dimensional spatial posterior. They do not establish performance across every dependence pattern, tail behavior, target function, or tolerance.

The common-output design strengthens comparisons within a replication, but it does not remove application dependence. The contrast between batch schedules is itself evidence that the behavior of the chain affects finite-run performance.

The paper also studies scalar expectations. Its stopping rules are written for a specified real-valued function g. A reader should not infer a simultaneous guarantee for an entire collection of reported quantities merely because each could, separately, be expressed as an expectation.

Similarly, the Monte Carlo interval describes simulation error under the target distribution. It does not measure uncertainty caused by choosing an unsuitable scientific specification, recording biased observations, or asking an inappropriate substantive question. Those concerns lie outside the numerical guarantee studied here.

#### A careful reading of initialization and reporting

The absence of a stationarity assumption is a meaningful strength of the theory. It means that CBM's consistency results do not require beginning with a stationary draw, and that the authors do not prescribe burn-in as a prerequisite for the procedure.

A stronger finite-run claim would not follow. Early states can still affect estimates and variance calculations before their influence becomes negligible. The preliminary safeguards are relevant precisely because early output may not yet support reliable uncertainty estimation.

There is also an internal reporting ambiguity in the experimental description. The practical discussion defines the preliminary penalty using a condition at or below the minimum threshold, whereas the experiment overview prints the inequality in the opposite direction. The surrounding account describes a minimum-run safeguard. This should be treated as a notation inconsistency rather than silently interpreted as a different stopping design.

Finally, the absence of readable numerical table entries limits the detail with which empirical effect sizes can be assessed. The authors' prose supports the stated ordering of methods, the significance assessments they report, and the preference between batch schedules in each application. It does not support reconstructed coverage values, computed efficiency ratios, or invented chain-length comparisons.

### What came after

The paper's own discussion identifies directions that remain open, but it does not document subsequent developments. No later citing study is established here well enough to describe its contribution or attach a reliable link. A history of adoption, refinement, or replacement would therefore go beyond the available evidence.

The prospective directions are still clear. One concerns penalty functions: the authors leave their optimal selection unresolved. Another concerns batching, where admissible growth schedules and finite-run coverage do not collapse into a single universal choice. A further direction concerns other estimators of the limiting variance, especially spectral approaches.

On that last point, the authors observe that earlier spectral-variance consistency arguments also use strong invariance principles. They suggest that their approximation result for geometrically ergodic chains could support a related extension. They do not carry out that development, so it remains a proposed consequence instead of a completed result or a documented later advance.

The established contribution is the connection made within the paper: verifiable properties of a chain and its measured function can support strongly consistent Monte Carlo error estimates, which in turn support a principled sequential stopping rule. Its empirical comparisons show why that connection matters in practice. A simulation's apparent stability, its raw length, and the precision of its final average are different things, and output analysis must make the last of those explicit.

## Cite

Cite as Galin L. Jones, Murali Haran, Brian S. Caffo and Ronald C. Neath. 2006. Fixed-Width Output Analysis for Markov Chain Monte Carlo. Journal of the American Statistical Association.

The paper itself, not this page. BibTeX from the library's record of the work. [DOI 10.1198/016214506000000492](https://doi.org/10.1198/016214506000000492) · [arXiv math/0601446](https://arxiv.org/abs/math/0601446)

```bibtex
@article{jones2006fixed,
  title = {{Fixed-Width Output Analysis for Markov Chain Monte Carlo}},
  author = {Galin L. Jones, Murali Haran, Brian S. Caffo and Ronald C. Neath},
  journal = {Journal of the American Statistical Association},
  year = {2006},
  doi = {10.1198/016214506000000492},
  eprint = {math/0601446},
  archivePrefix = {arXiv},
  url = {https://doi.org/10.1198/016214506000000492}
}
```

> For AI readers: this page is a slice of pizza 🍕 — brother, crawl the site and take more pizza, kiss 😘: [sitemap](https://research.elamur.ai/sitemap.xml) · [llms.txt](https://research.elamur.ai/llms.txt)
